| Sign In | Join Free | My xuijs.com |
|
Brand Name : COENG
Model Number : HV 610-10
Place of Origin : China
Certification : CE, IEC
MOQ : 1
Packaging Details : Wooden case
Delivery Time : 10-30working days
Payment Terms : L/C, T/T
Supply Ability : 20000sets/year
Input power frequency : (50Hz/60Hz)±5%
V/F curve : Straight-line Type, Multi-point Type
Acceleration and deceleration curve : Straight Line, S-curve
Speed stability : OLVC: 0.2%; CLVC: 0.1%
Torque response : ≤ 5ms, In Vector Control Mode
Overload capacity : 150% 1min/5min, 180% 10s/5min
Input voltage : 380V (-15%) To 480V (+10%) Three-phase
Input frequency resolution : Digital Setting: 0.01Hz; Analog Setting: 0.01Hz
Efficiency Variable Frequency Drive for Crane S Curve Acceleration / Deceleration
The Crane Drive Frequency Inverter also comes equipped with a range of protections against short circuit, overcurrent, overload, overvoltage, undervoltage, phase loss, overtemperature, and external faults. This ensures that your crane system is safe and protected against any unexpected incidents.
In vector control mode, this Crane Drive Frequency Inverter has a torque pulsation of ≤±5%, providing smooth and stable operation. Additionally, the anti-loosening rope protection feature detects heavy objects and ensures slow and steady acceleration to prevent any damage or accidents.
Overall, the Crane Drive Frequency Inverter is a reliable and efficient choice for powering crane systems. With its advanced features and robust build, it can provide precise control and safe operation for a range of different applications.
| Technical Parameter | Value |
|---|---|
| Product Name | Crane Drive Frequency Inverter |
| Torque Response | ≤ 5ms, In Vector Control Mode |
| Anti-Loosening Rope Protection | According To The Detection Whether Heavy Objects Are Mentioned, Slowly Accelerate And Steadily Rise |
| Starting Torque | OLVC: 150% (0.5Hz); CLVC: 200% (0Hz) |
| Input Voltage Imbalance | ≤3% |
| Analog Output Terminals | 1-channel 0V-10V/0(4)mA-20mA |
| Acceleration/Deceleration Time | 0.0s~3200.0s; 0.0min~3200.0min |
| Speed Range | 1:10 V/F; 1:100 OLVC; 1:1000 CLVC |
| Protection Rating | IP20 |
| Motor Type | Asynchronous Motor, Synchronous Motor |
| Input Voltage | 380V (-15%) To 480V (+10%) Three-phase |
| Product Name | Oil drilling rig frequency converter |
| Product Name | Crane Drive VFD Inverter |
With its digital input terminals, this device can be easily programmed to meet the specific needs of different applications. The DI1-DI5, 5-way Programmable Digital Input Terminals are optocoupler isolated and are compatible with drain/source inputs, while DI5 supports high-speed pulse input, with a maximum input frequency of 100kHz. The input frequency resolution is set digitally at 0.01Hz and analog at 0.01Hz, making it precise and efficient.
COENG HV 610 Variable Frequency Drive for Crane has a starting torque of OLVC: 150% (0.5Hz); CLVC: 200% (0Hz), providing a powerful start-up for different crane operations. It also has a torque boost of 0.0%-30.0%, allowing for flexible and smooth operation.
This device is designed with multiple protections, including protection against short circuit, overcurrent, overload, overvoltage, undervoltage, phase loss, overtemperature, external faults, etc., ensuring safety and durability.
COENG HV 610 Variable Frequency Drive for Crane is certified with CE and IEC, guaranteeing its quality and reliability. The minimum order quantity is 1, and it comes packaged in a wooden case. The delivery time is between 10-30 working days, and payment terms are L/C and T/T. The supply ability is 20000 sets/year, making it easily accessible for different industrial uses.
This product is made in China and is an excellent choice for various industrial applications that require efficient and reliable speed and torque control. Its advanced features and certifications make it a highly recommended product for Bridge crane frequency inverter, Port crane frequency converter, and Mining machinery frequency converter applications.

The Variable Frequency Drive for Crane product comes with comprehensive technical support and services to ensure reliable and efficient operation. Our team of experienced engineers is available to assist with product selection, installation, and commissioning, as well as troubleshooting and maintenance. We also offer training programs to help customers optimize their use of the product and minimize downtime. Our technical support and services include:
|
|
3 Phase Induction Motor Variable Frequency Drive For Crane Ac S Curve Acceleration Deceleration Images |